 Assignment - A

 

Q1: Discuss the differences in the following:

(a) Top-down and bottom-up

(b) Black box and white box testing

 

Q2: What do you mean by software maintenance? Explain the maintenance tools in details in details.

 

Q3: Explain why a design with low coupling helps maintainability

 

Q4: What is software design? Discuss the design principles in detail.

 

Q5: Explain on the following:

(a) Problem partitioning

(b) Abstraction


 

Case Study

 

Consider a program for determining the previous date. Its input is a triple of day, month and year with the values in the range

1 month 12

1 day 31

1900 year 2025

 

The possible outputs would be previous date or invalid input date. Design the boundary value test cases.

 

Assignment – C

 

Q1: In Waterfall model user involvement is in--

All phases

Some phases

Not involved

None

 

Q2: In Planning we include--

What is to be done

How is to be done

By whom is to be done

None

 

Q3: Which SDLC includes Risk?

Spiral model

Waterfall model

Iterative model

None

 

Q4: Design type are--

Conceptual design

Technical design

Both

none of the above

 

Q5: Two basic issues for software engineering are--

Engineering-design

Hardware-software

Software quality-cost

None

 

Q6: Costliest phase of software development is--

Testing

Coding

Analyzing

None

 

Q7: An example of an expert system is--

The internist

A stock and bond analyze

Structural analyze

None

 

Q8: A virtual interface that--

Is easy for programmer

Is similar to doing traditional computer programming

Does not allow user to take shortcuts

None

 

Q9: The screen displays produced by a prototyping software package--

Are the output produced by complete system program

May closely model the output that may produced by system program

Discourage user

None

 

Q10: The following is not normally used during System Design--

Program review

Working prototype

Standard manual

None of the above

 

Q11: Approach used in top-down analyzes and design--

Identify a top- level function and then create a hierarchy of lower level modules and component

To prepare flowchart.

All

None of the above

 

Q12: During the data gathering phase of system analysis--

Problem flowchart are often prepared

System design specification are outlined

Number of specialized forms may be prepared

None

 

Q13: First step of implementation phase is--

Select computer

Implementation planning

Prepare physical facilities

None

 

Q14: A programmer would most likely prepare a

General system flowchart

Specific system flowchart

General program flowchart

Specific program flowchart

 

Q15: Implementation of project proposal is prepared by--

The executive vice-president and manager

Vice president of information system

System analyst guidance of vice-president of information system

None

 

Q16: Design specification does not normally include--

Output requirement

Input requirement

Control provision

None

 

Q17: Some firms have created a combination position called--

Analyst/manager

Manager/operator

Analyst/programmer

None of above

 

Q18: During the system study, vice-president and manager do the--

Planning

Directing

Controlling

None of above

 

Q19: In token count N=N1+N2, where N1 is--

Unique operator

Unique operand

Occurrence of operator

None

 

Q20: Features of function point are--

Average, low, high

Average

High

None

 

Q21: In function point function units are--:

5

4

6

3

 

Q22: Risk management is of --------- types.

List of potential risk

Prioritized list of risk

Risk avoidance

Risk assessment

 

Q23: Organic COCOMO model have range of-

0-50 kloc

50-300 kloc

Over 300 kloc

None

 

Q24: Which one is not user documentation?

Beginner’s guide

Installation guide

SRS

None

 

Q25: AMC stands for--

Annual maintenance cost

Annual manage effort

Development effort

None of above

 

Q26: In Token count total length is equal to--

n= n1+n2

n2= n1+n3

n=n1/n2

none

 

Q27: Average Staff is calculated on the basis of--

Effort

Development

Effort/development

None

 

Q28: Risk Analysis means--

Evaluate probability

Probability ranges

Both

None of these

 

Q29: Software Engineering means--

Making software

Manufacturing software

Developing software

None

 

Q30: Software is easy to change, this statement is--

True

Myth

Hypothetical

None of above

 

Q31: Which one is maintenance model?

CMM

Quick fix model

Iterative model

None

 

Q32: In which model fixes are done without detailed analyses of the long term effects?

Reuse enhancement model

Quick- fix model

Taute model

None of the above

 

Q33: Iterative enhancement model has--

3 stages

6 stages

4 stages

None of the above

 

Q34: Taute maintenance model has--

2 phase

4 phases

5phasea

10 phases

 

Q35: In Bohem model ,ACT stands for--

Actual change time

Annual change time

Actual change traffic

Annual change time

 

Q36: Regression testing is known as--

The process of retesting the modified parts of software

Process of testing the design document

Review the SRS

None of these

 

Q37: Regression testing is related to--

Maintenance of software

Development of software

Both

None

 

Q38: Legacy system is--

Old system

New system

Undeveloped

None of the above

 

Q39: User Documentation consist of--

Beginner’s guide

Installation guide

Reference guide

None of the above

 

Q40: Which one is not user documentation?

Beginner’s guide

Installation guide

SRS

None

 

Quick Find
 
Use keywords to find the product you are looking for.
Advanced Search
Share Product

osCommerce Online Merchant Copyright © 2010 osCommerce
osCommerce provides no warranty and is redistributable under the GNU General Public License
Note: We provide all Solutions and Contents for Reference/Study purpose only.